INCINERATOR QUESTIONNAIRE

7. Type of waste  : Bio-medical / Hazardous / Municipal / Trash  = ALL and Mixed
8. Any other : Rubber, rubber tyres, Batteries, green waste, paper and cardboard
9. Quantity of waste generated per day in kg : 3 -5 tonnes per day
10. Duration C incinerator will be used per day : 1 C 8 hours / 1 C 16 hours / Continuous 
11. Approximate moisture content: Variable
12. Local incinerator operating and emission standards : India / EURO / US-EPA  Australia
13. What is the height of the chimney required? : No chimney is required. Flue length should be approximately 2 to 3 metres to join to a downstream process
14. Fuel proposed to be used :  LDO / HSD / FO / SKO/ Gas / Other  – No fuel required – Intended to free burn waste products
15. Availability of power and type : Electricity if required
16. Details of space available :  Not restricted
17. Do you require an automatic loading system? : [X ] Yes         [ ] No 
18. Do you require a gas scrubbing system? : [ ] Yes         [X ] No 
19. How soon do you require the system to be delivered? : Sea Freight to Port of Cairns, Queensland, Australia in approximately Two months
20. City and country of use :  Australia
21. Whether the location is a coastal area : [ ]Yes         [X ] No 
22. Any other specific requirements: Primary combustion chamber only is required. Solid and inflammable waste products need to be capable of being recovered from the incinerator easily using an automated procedure. This is because the incinerator will be required to operate 24/7. Rotary kiln or moving floor may be considered if deemed practical by the supplier. One initial incinerator is required for a proof of concept project and future orders for the successful supplier, following successful implementation of this project, are likely to be significant.
23. It would be most useful if the supplier could send a video of the incinerator in operation or diagrams and pictures to show how it works.